CIL and Leach Tanks

CIL and Leach Tanks

Complete Tank Refurbishments IAW API653 including:

  • Launders, nozzles and manways, baffles, draft tubes and cradles
  • Full tank shell strake repairs and replacements
  • Tank floor repairs and replacements
  • Remove and replace agitator, drives, shafts and blades as per specification
  • Welding and traceability as per approved weld procedures and welder qualifications
  • Structural stiffening of compromised tanks
  • Robotic surface preparation
  • External surface treatment of tanks
  • Sub-floor soil removal, replacement, compacting
  • Boot seal application
  • Ring beam repairs and replacements
  • Repair/replace top of tank steelworks
  • Grid mesh repairs/modifications
  • Non-destructive testing on repair works
  • Structural integrity remediation execution

Polyurea is an ideal lining for the corrosive and abrasive conditions found within CIL tanks. As polyurea sets almost instantly in all ambient conditions, the CIL tanks can be returned to service within hours of completion of the lining.

  • Specialised polyurea tank lining complete with spark testing and documented quality assurance
  • Quicker overall project schedule means the tank is returned to the circuit sooner, decreasing loss of yield and saving money
  • Flexible membrane means that the lining does not crack
  • Fast cure means that the lining can be spark tested and returned to service directly after spraying is complete
  • Cure is unaffected by cold temperature
  • Any repairs or touch ups can be made without waiting for the liner to cure
  • Polyurea is touch dry within seconds, regardless of ambient conditions
  • Unlimited film build in a single application means that we can apply at a higher thickness at high abrasion/wear points e.g. around baffle supports
  • Higher abrasion resistance