1
Eight (8) newly constructed CIL Tanks at KOTH Gold Mine
2
Internal Tank Lining, including walls, baffles, downcomer pipes and tank floor
3
Quick dry, high film build (2-3 mm DFT) sprayed in single one coat application
About the Project
Special Points Of Interest
- Higher film thicknesses can be applied to high wear areas to increase service life.
- Polyurea coatings provide the ultimate protection for CIL tank internal lining.
- Eight (8) newly constructed CIL Tanks, total approximately 6500 m2 area, completed safely and within schedule.